[Transmitted by Freethinker]

Continued. Beginning https://t.me/Volnodumetz/639


Since January 15 this year there has been a new redistribution of property in the "DNR." If in metallurgy the leading investor, Igor Dmitriyevich Andreev, has been defined, then the coal industry, despite the creation of the company "Don" coals, behind which Vladimir Medvedchuk's management is allegedly behind, has not received a starting point for the development of the industry. 


The coal sector is still developing in a "free fall" and is characterized by the desire of the Deneer officials to profit from the underestimated price of Donetsky coal and overpriced equipment supplied by them through front men. In addition, there is serious manipulation by the Deneer management with the prices and volumes of energy resources for private companies and the so-called "state" property.


On January 15, 2021 it was announced in the "DNR" about the transition of the management of the coal industry and metallurgy from CJSC "Vneshtorgservice" to the company "Donskiye Ugol", and "Yuzhmash" and DMZ were merged into a single enterprise LLC "DMZ". The main sponsor of the development of "DMZ" and allegedly its owner in the "DNR" was I. D. Andreev. D., who is the owner of "Moloko-Hercules" Trading House, "Electrostal" plant (Kurakhovo), "Donetsk Metal Rolling Plant", and, since January of this year, "Sheglovskaya", "Donbass", "Chelyuskintsev" mines, "Enakievo Coke Chemical Plant", "Amstor" Trading House and others).


In March of this year. "The Interdepartmental Commission (IC) on assistance to the "LDNR", headed by Russian Deputy Minister of Economic Development Sergei Nazarov, approved in the Russian government an assistance program worth 60 billion rubles. But most of this aid will be provided to the "DPR" with equipment, materials, and raw materials supplied from Russia.


The MK and the Russian government give priority attention to infrastructures and areas related to the provision and functioning of the 1 AC. Everything else is provided in quantities to keep the population from the mass protests that took place last year among the miners and metallurgists.


The "DNR" leadership, represented by D. Pushilin and Yevgeny Lavrenov (Minister of Revenues and Levies) convinced S. Nazarov to finance the restoration of the DMZ, whose workers went out to small rallies three times during 2020 and wrote letters to Pushilin several times about non-payment of salaries in the amount of 43 million rubles. At the same time the Russians were told that local businessman I. Andreev will be the main investor of the plant, will pay off all debts on wages and during 3 years he will invest about 10 billion rubles in the development of the plant. But on April 23 of this year, the Denaer management already announced that the amount of investments would be about 8.5 billion rubles).


On April 20 this year, the first blast furnace at DMZ was put into operation. According to the "DNR" media, 15,000 tons of pig iron has already been melted in this furnace. 

Now they are trying to start the second furnace, which was stopped in 2019 with violations of technology, and this will actually require a complete replacement of all internal equipment and will take about 3 months to repair.  Technologically, both furnaces can produce up to 1,700 tons of pig iron per day, but even in stable times before 2014, the two furnaces were producing up to 90,000 tons of pig iron per month. It is almost impossible to achieve this level in the "DNR" due to the lack of regular and sufficient supplies of raw materials, as well as due to a number of other technical problems.

https://telegra.ph/Situaciya-na-DMZ-06-04

*** Translated with www.DeepL.com/Translator (free version) ***


Просмотры:

Коментарі

Популярні публікації